Garage projects
Plan a double garage for two vehicles and daily life
Explore double garage layouts for Calgary and Edmonton. Compare vehicle clearance, storage, door choices and the scope to include in your garage enquiry.
Garage planning journal
List what you expect to power before the garage design is finalized. Lighting, tools, heating and vehicle charging should be considered together by the electrician assessing the project.
Start with ordinary activities: entering after dark, using a bench, opening garage doors and reaching stored items. Then list specific equipment you own or intend to buy. Use manufacturer details where available, and mark future possibilities as unconfirmed.
Tell the electrician which devices may run at the same time. Do not choose circuit sizes or assume spare breaker spaces prove capacity. An electrical assessment needs more information than a photograph of a panel. The professional should determine the appropriate design and any changes to the existing service.
Show the parked vehicles, bench, doors, fixed storage and likely charger location. Consider where you approach the vehicle and where its charging port is located. A cable route should be planned with normal pedestrian movement in mind; equipment installation details remain a professional responsibility.
Ask how the layout would work with a different vehicle or a second future charger. You do not need to buy every possible upgrade now, but it helps to understand which future changes would reopen finished areas or alter the service route.
| Proposal wording | Ask for a specific explanation |
|---|---|
| Electrical included | Which lights, outlets, door connections and other work are included? |
| EV ready | Is this a planned route, conduit, wiring, a connection point or installed charging equipment? |
| Future capacity | What assessment supports the statement and which future load is assumed? |
| Charger supplied | Which model, who supplies it and who installs and commissions it? |
A phrase such as “EV ready” is too broad to compare without a scope description. Keep equipment, installation, assessment and any service changes as identifiable parts of the quote.
City of Calgary: electrical and plumbing permits requires permits for new or altered wiring and excludes EV charging wiring and load calculations from the homeowner-permit scope described on that page. Use a qualified electrical contractor to assess the charging project and confirm the required permit.
For Edmonton, start with the Edmonton garage permit guide and confirm the electrical pathway with the City and your contractor. Do not assume a Calgary homeowner rule applies to another municipality.
Send your city, garage size, intended use and major equipment list with the project enquiry. Ask which trade work is included in the proposed garage scope and which items need a separate quotation. AB Garage Builders does not publish a universal electrical package or guaranteed charging capacity.
If heating is part of the plan, read heated versus unheated garage planning as well. The useful outcome is one coordinated set of requirements, not separate assumptions made after the walls are finished.
MAKE SPACE FOR WHAT MATTERS
Put your city, space and priorities in one simple brief.